How We Work

Our End-to-End
Design + Build Process

Building a custom home is the most complex project most people will ever undertake. Pacific Crest’s integrated process eliminates the confusion, reduces the risk, and delivers a seamless experience — from the first conversation to the final walkthrough.

9

Defined Project Phases

1

Team. One Contract.

0

Surprises. Guaranteed.

100%

Transparent Communication

Why Integrated Design-Build

The Problem with the Traditional Approach

Most homeowners start by hiring an architect, who designs a home, then hand the drawings to a contractor who bids on them. The result is almost always the same: the contractor’s bid comes in 30–50% over the architect’s estimate, leading to painful redesigns, delays, and a fractured relationship between the two firms.
Pacific Crest eliminates this problem entirely. Our in-house licensed architect and licensed general contractor are the same team. Design decisions are made with full, real-time awareness of construction costs. The result is a home that is designed to be built — on time, on budget, and exactly as envisioned.

Phase One

Discovery & Initial Consultation

Understanding your vision, your site, and your goals before a single line is drawn.

1–2 Weeks

01

Phase 1 Deliverables

Every Pacific Crest project begins with a complimentary consultation — a genuine conversation, not a sales pitch. We want to understand your vision, your lifestyle, your timeline, and your budget before we discuss anything else.

During this phase, we conduct a thorough site analysis: reviewing your property’s zoning, setbacks, height limits, FAR restrictions, and any overlay zones or deed restrictions that will shape what can be built. We also assess site conditions — topography, soil, access, utilities, and neighboring structures — to identify opportunities and constraints early.

What Happens in This Phase

At the conclusion of Phase 1, you will have a clear understanding of what is possible on your site and a realistic sense of the investment required. If we are the right fit for each other, we move forward with a signed design agreement.

Phase Two

Architectural Concept Design

Translating your vision into a spatial concept that works on your site and within your budget.

4–6 Weeks

02

Phase 2 Deliverables

This is where your home begins to take shape. Our licensed architect develops initial concept designs — floor plan options, massing studies, and preliminary elevations — that respond to your site, your program, and your aesthetic preferences.
Because our architect and contractor work together, every concept is developed with real cost awareness. We are not designing in a vacuum and then handing drawings to a contractor who delivers a shocking bid. Budget alignment is built into the process from the very first sketch.

What Happens in This Phase

You will leave Phase 2 with a clear concept design you are excited about — and a budget estimate you can rely on. This is the foundation for everything that follows.

Phase Three

Design Development & Interior Design

Refining every detail of your home — architecture, interiors, and materials — before construction begins.

6–10 Weeks

03

Phase 3 Deliverables

Design development transforms the approved concept into a fully resolved design. Every room, every wall, every window, and every detail is worked through in this phase. Our interior designer joins the process here, ensuring that the architecture and interiors are developed as a unified whole rather than as separate afterthoughts.

This phase also includes the production of photorealistic 3D renderings and virtual walkthroughs — one of the most valuable tools we offer. Seeing your home in three dimensions before construction begins allows you to make confident decisions about space, light, materials, and finishes, eliminating the costly changes that plague projects where decisions are deferred to the construction phase.

What Happens in This Phase

Phase Four

Entitlements & Permitting

Navigating the regulatory process so you do not have to — from permit application to final approval.

3–9 Months (varies by jurisdiction)

04

Phase 4 Deliverables

Permitting is where many custom home projects stall — or fail entirely. The regulatory environment in Southern California is among the most complex in the country, with multiple overlapping jurisdictions, lengthy plan check queues, and ever-changing code requirements.

Pacific Crest’s team manages the entire permitting process on your behalf. We prepare complete permit application packages, respond to plan check comments, coordinate with structural and civil engineers, and maintain active communication with building department plan checkers to keep your project moving forward.

What Happens in This Phase

While permits are being processed, our team uses this time productively — finalizing subcontractor bids, procuring long-lead materials, and completing all pre-construction planning so we are ready to break ground the day permits are issued.

Phase Five

Pre-Construction Planning

Every detail resolved before the first shovel breaks ground — because surprises during construction are expensive.

4–6 Weeks

05

Phase 5 Deliverables

Why This Phase Matters

Industry data shows that 80% of construction budget overruns are caused by decisions deferred to the construction phase. Pacific Crest’s pre-construction process is specifically designed to eliminate this risk.

Pre-construction is the phase that separates disciplined builders from reactive ones. Before a single shovel breaks ground, Pacific Crest resolves every material selection, confirms every subcontractor, and produces a detailed construction schedule with clear milestones.

This phase is where the majority of change orders — the primary source of budget overruns on custom home projects — are prevented. By making every decision before construction begins, we eliminate the costly mid-build changes that derail timelines and inflate budgets.

What Happens in This Phase

Phase Six

Construction

Your home is built with precision, transparency, and the craftsmanship that Pacific Crest is known for.

10–18 Months (project dependent)

06

During Construction

Construction is where years of planning and months of design come to life. Pacific Crest’s licensed general contractor manages every phase of construction with the same attention to detail that characterizes our design process.

You will never wonder what is happening on your project. Our project manager provides weekly written progress updates, monthly budget reconciliations, and is always available to answer questions. We use a cloud-based project management platform that gives you real-time visibility into schedule, budget, and daily site activity.

Construction Phases

Quality Control

Phase Seven

Interior Finish & Furnishing

The details that transform a house into a home — curated by our interior design team.

Concurrent with late-stage construction

07

Phase 7 Deliverables

As construction nears completion, our interior design team shifts into finish mode. This phase covers all the details that distinguish a truly exceptional home from a merely well-built one — the hardware, the lighting fixtures, the art placement, the window treatments, and the furnishings that bring the space to life.

Because our interior designer has been involved since Phase 3, there are no last-minute surprises. Every selection has been made, every item has been ordered, and the installation sequence is coordinated with the construction schedule to ensure a seamless transition from construction to move-in.

What Happens in This Phase

Phase Eight

Landscape Design & Installation

The outdoor environment is not an afterthought — it is the final layer of a complete home.

4–8 Weeks

08

Phase 8 Deliverables

In Southern California, outdoor living is not a luxury — it is a fundamental part of how people live. Pacific Crest’s landscape design team creates outdoor environments that are as carefully considered as the interiors, extending your home’s living space into the exceptional Southern California climate.

Landscape design is integrated into the project from Phase 3, ensuring that the outdoor spaces are designed in concert with the architecture rather than as a disconnected afterthought. Grading, drainage, irrigation, and hardscape are all coordinated with the construction team to ensure seamless execution.

What Happens in This Phase

Phase Nine

Project Completion & Handover

The moment your vision becomes reality — and the beginning of our ongoing relationship.

1–2 Weeks

09

Phase 9 Deliverables

Our Commitment After Completion

Pacific Crest provides a one-year workmanship warranty on all construction work, plus the full manufacturer warranties on all systems and materials. We remain available for warranty service and are proud that many of our clients return to us for future projects.

The completion phase is not just the end of construction — it is the beginning of your life in your new home. Pacific Crest conducts a thorough final walkthrough with you, reviewing every system, every finish, and every detail to ensure everything meets our standards and yours.
We provide a comprehensive homeowner’s manual documenting every system in your home — HVAC, plumbing, electrical, smart home, and appliances — along with maintenance schedules and warranty information. Our relationship does not end at handover; we remain available for questions, warranty service, and future projects.

What Happens in This Phase

Project Timeline

From First Call to Move-In Day

A typical Pacific Crest custom home project spans 18–30 months from initial consultation to Certificate of Occupancy. Here is how that time is allocated.

1–2

Months

Discovery & Concept

2–4

Months

Design Development

3–9

Months

Pre-Construction

1–2

Months

Pre-Construction

10–18

Months

Construction

1–2

Months

Completion

Timeline varies based on project scope, jurisdiction, and permitting complexity. Pacific Crest provides a detailed project schedule at the conclusion of Phase 3.

Common Questions

Frequently Asked Questions

What is the minimum project size you work on?

Pacific Crest specializes in projects with a construction budget of $1 million or more. This includes new custom homes, major additions of 1,000 square feet or more, and significant whole-home renovations. We are not the right fit for smaller remodels or cosmetic renovations.

How is design-build different from hiring an architect and contractor separately?

In the traditional model, your architect designs a home and hands the drawings to a contractor who bids on them — often coming in 30–50% over the architect’s estimate. In design-build, the architect and contractor are the same team, so every design decision is made with full cost awareness. The result is a home that is designed to be built within your budget.

How long does the permitting process take in Los Angeles?

Permitting timelines vary significantly by jurisdiction and project complexity. In Los Angeles, a standard custom home permit typically takes 6–12 months. Projects requiring variances, design review, or Coastal Commission approval may take longer. Pacific Crest begins the permitting process as early as possible and manages it proactively to minimize delays.

Can I make changes during construction?

Our pre-construction process is specifically designed to resolve all decisions before construction begins, which minimizes the need for changes. However, we understand that circumstances change. Any changes during construction are documented as formal change orders with a clear description of the scope change, cost impact, and schedule impact before work proceeds.

Do you work with clients who already have an architect?

Our preferred model is fully integrated design-build, where our architect leads the design process. However, we do work with clients who have an existing relationship with an independent architect in a construction management capacity. Contact us to discuss your specific situation.

What does your fee structure look like?

Pacific Crest charges a design fee for the design phases (Phases 1–3), which is credited against the construction contract. Construction is priced on a fixed-scope, fixed-price basis — you know exactly what you are paying before we break ground. We do not use cost-plus contracts, which can expose clients to unlimited cost escalation.

Ready to Begin Your Custom Home Journey?

The first step is a conversation. Schedule a complimentary consultation with our design-build team and let us show you what is possible on your site.

Get in Touch

Start Your Project

Tell us about your vision. Our team will reach out within one business day to schedule your complimentary consultation.

We serve homeowners throughout Southern California:

Culver City

Los Angeles

Santa Monica

South Bay